AllPoints 106-1231 - Encore Pre-Rinse Hose With Handle 44" Long, Lead-Free

SKU
885-454
VPN
32-2156
Brand
$110.00 /Each

This item ships directly from manufacturer

Lead times may vary based on manufacturer stock

Product details
Specifications
Recommended Products
Q&A
Reviews

Product details

This AllPoints 106-1231 is available from Central Restaurant Products.

Features Include:
  • AllPoints# 106-1099 (5" Black Plastic Handle) & Washers
  • Y
  • 44"
  • 1118 mm
  • Stainless Steel Outer Casing
  • Santoprene Thermoplastic Rubber Core
  • 3/4"-14 Female
  • Flexible
  • 1.81 Lb


This part is equivalent to these COMPONENT HARDWARE GROUP part numbers:
  • K50Y004,KL50Y004-44,KL50-Y004-44,KN50Y004-44,KN50-Y004-44


For additional questions, please speak with one of our helpful product consultants at 800.215.9293 - or click the 'Live Chat' button.
View More

Specifications

Add to Compare
More Information
VPN32-2156
UnitEach
Weight1.810000
Hubert SKU125257
BrandAllPoints
View More

Q&A

Reviews